7 men and 15 women complete work in 15 days. 18 men and 20 women complete the same work in 8 days. X men and 20 women can complete the work in 10 days. Find X.
- A. 18
- B. 16
- C. 24
- D. 12 (Correct answer)
- E. 20
Correct Answer
Option D — 12
Detailed Solution & Explanation
Option D (12) men are required alongside 20 women.
Equate total work ($W$) in both cases:
$15(7M + 15W) = 8(18M + 20W)$
$105M + 225W = 144M + 160W \Rightarrow 65W = 39M \Rightarrow 5W = 3M$
Convert everything into men-equivalent ($1W = \frac{3}{5}M$):
- Total work: $8(18M + 20 \times \frac{3}{5}M) = 8(18 + 12)M = 8 \times 30M = 240M$-days.
- 10-day team: $10(XM + 20 \times \frac{3}{5}M) = 240M \Rightarrow X + 12 = 24 \Rightarrow X = 12$.