7 men and 15 women complete work in 15 days. 18 men and 20 women complete the same work in 8 days. X men and 20 women can complete the work in 10 days. Find X.

  1. A. 18
  2. B. 16
  3. C. 24
  4. D. 12 (Correct answer)
  5. E. 20

Correct Answer

Option D — 12

Detailed Solution & Explanation

Option D (12) men are required alongside 20 women.

Equate total work ($W$) in both cases:

$15(7M + 15W) = 8(18M + 20W)$

$105M + 225W = 144M + 160W \Rightarrow 65W = 39M \Rightarrow 5W = 3M$

Convert everything into men-equivalent ($1W = \frac{3}{5}M$):

  • Total work: $8(18M + 20 \times \frac{3}{5}M) = 8(18 + 12)M = 8 \times 30M = 240M$-days.
  • 10-day team: $10(XM + 20 \times \frac{3}{5}M) = 240M \Rightarrow X + 12 = 24 \Rightarrow X = 12$.