When was the Banihal-Qazigund section of the railway project inaugurated?

  1. A. June 2012
  2. B. June 2013 (Correct answer)
  3. C. July 2013
  4. D. July 2014

Correct Answer

Option B — June 2013

Detailed Solution & Explanation

The Banihal–Qazigund rail section — featuring the $11.2\text{ km}$ Pir Panjal Railway Tunnel linking Jammu's Banihal with the Kashmir Valley — was inaugurated in June 2013, marking a major engineering milestone in connecting the Valley to the rest of the Indian railway network under the USBRL project. Under J&K General Knowledge (J&K General Knowledge), this concept is a high-frequency competitive exam topic; options such as (A) June 2012, (C) July 2013, (D) July 2014 pertain to different categories, timelines, or provisions and are therefore eliminated.

Topics covered: J&K General Knowledge