A contractor assigns a task to two workers, A and B. Worker A can complete the work in x days, while worker B takes 5 days more than A. Working together, they can finish the task in 6 days. Find the value of x.

  1. A. 12
  2. B. 8
  3. C. 10 (Correct answer)
  4. D. 6

Correct Answer

Option C — 10

Detailed Solution & Explanation

10 (Option C) — If worker A finishes in x days and worker B takes x + 5 days, their combined daily rate equals 1/x + 1/(x + 5) = 1/6. Cross-multiplying yields x² + 5x = 6(2x + 5), or x² − 7x − 30 = 0, which factors as (x − 10)(x + 3) = 0. Since days must be positive, x = 10 days (with B taking 15 days). Therefore, Option C (10) is the verified correct response under Time & Work (Mathematics).

Topics covered: Time & Work Quadratic Equations